Skip to main content Skip to complementary content
Close announcements banner

Setting up the Job

Procedure

  1. Select and drop the following components from the Palette onto the design workspace: tFileInputDelimited, tFileOutputExcel, tJava.
  2. Connect the tFileInputDelimited to the tFileOutputExcel using a Row Main connection. The content from a delimited txt file will be passed on through the connection to an xls-type of file without further transformation.
  3. Then connect the tFileInputDelimited component to the tJava component using a Trigger > On Subjob Ok link. This link sets a sequence ordering tJava to be executed at the end of the main process.

Did this page help you?

If you find any issues with this page or its content – a typo, a missing step, or a technical error – let us know how we can improve!