Using data quality items from the referenced project
When one project references another, all items in the referenced project are available for reuse from the main project.
When you import analyses from a reference project into a local project or a remote project which does not connect to the same reference project, you will have problems opening the analyses and running them. This is because only analyses are imported without their items. You must first create the connection to the same reference project before being able to correctly use the analyses in the current project.
Before you begin
- You have read-writing authorization for the main and referenced projects. For further information, see Talend Administration Center User Guide.
- You have opened the main project in the Studio.
Procedure
Results
The table is analyzed against the business rule from the reference project and results are displayed in the editor.
Did this page help you?
If you find any issues with this page or its content – a typo, a missing step, or a technical error – let us know how we can improve!