Displaying the execution time and other options - 8.0

Talend Data Integration Studio User Guide

Version
8.0
Language
English (United States)
EnrichDitaval
Data Integration
Product
Talend Data Integration
Module
Talend Studio
Content
Design and Development

Procedure

  • To display the total execution time, select in the Advanced settings tab of the Run view the Exec time check box before running the Job.

    This way you can test your Job before going to production.

  • To clear the design workspace before each Job execution, select the check box Clear before Run.
  • To save your Job before the execution starts, select the relevant option check box.