Removing old versions of project items - Cloud - 8.0

Talend Studio User Guide

Version
Cloud
8.0
Language
English
Product
Talend Big Data
Talend Big Data Platform
Talend Cloud
Talend Data Fabric
Talend Data Integration
Talend Data Management Platform
Talend Data Services Platform
Talend ESB
Talend MDM Platform
Talend Real-Time Big Data Platform
Module
Talend Studio
Content
Design and Development
Last publication date
2024-02-29
Talend Studio allows you to remove old versions of each item in the Repository tree view.

Procedure

  1. Click File > Edit Project properties from the menu bar.
    The Project Settings dialog box displays.
  2. In the tree view of the dialog box, click General > Version Management > Cleanup to open the corresponding view.
  3. In the Repository tree view, expand the nodes if needed, and select the check boxes for the corresponding items whose old versions you want to remove.
  4. Select either of the following two options according to your needs:
    • Remove all old versions and keep only the latest one: to remove all old versions and keep only the latest one for selected items.
    • Remove all old versions lower than: to remove all old versions lower than a specific version for selected items. With this option selected, you need to enter a specific version number, for example, 0.2 or 1.0, in the text field next to it. Note that the latest version of any item will never be removed even if it is lower than the specified version.
    Warning: There is no dependency check when removing old versions of Jobs, Joblets, Routes, and Routelets. We recommend you to do the removal and validate the cleanup on a branch.
  5. Click Remove.
    The old versions of selected items are removed. A dialog box pops up, which displays the number of removed items and a link to the cleanup report. The report includes the type, the name, and the version of each removed item.