Dropping and linking the components
Procedure
- From the Palette, expand the Connectivity folder. Drag and drop a cFile and two cMessagingEndpoint components onto the design workspace.
- From the Routing folder, drag and drop a cMulticast component onto the design workspace.
- From the Custom folder, drag and drop four cProcessor components onto the design workspace.
- From the Core folder, drag and drop three cSetBody components onto the design workspace.
- Label the components as shown above to better identify their roles in the Route.
- Right-click the cMulticast component, select Row > EndBlock in the context menu and click the cProcessor component labeled Monitor_endblock.
- Right-click the cFile component, select Row > Route in the context menu and click the cMulticast component. Repeat this step to link the rest components in the Route as shown above using the Row > Route connection.
Did this page help you?
If you find any issues with this page or its content – a typo, a missing step, or a technical error – let us know how we can improve!