Creating a Job from multiple paths from a single source to the same target - Cloud - 8.0

Technical

Version
Cloud
8.0
Language
English
Product
Talend Big Data
Talend Big Data Platform
Talend Data Fabric
Talend Data Integration
Talend Data Management Platform
Talend Data Services Platform
Talend ESB
Talend MDM Platform
Talend Real-Time Big Data Platform
Module
Talend Studio
Content
Data Governance > Third-party systems > Technical components
Data Quality and Preparation > Third-party systems > Technical components
Design and Development > Third-party systems > Technical components
Last publication date
2024-02-20

Creating a subJob with a multiple path structure from a single source to a single target, as shown in the capture below, is not allowed in Talend Studio. In this document, you will find two workaround examples to solve this problem that provide the same result.