Creating a Job from multiple paths from a single source to the same target - Cloud - 8.0

Technical

Version
Cloud
8.0
Language
English (United States)
Product
Talend Big Data
Talend Big Data Platform
Talend Data Fabric
Talend Data Integration
Talend Data Management Platform
Talend Data Services Platform
Talend ESB
Talend MDM Platform
Talend Open Studio for Big Data
Talend Open Studio for Data Integration
Talend Open Studio for Data Quality
Talend Open Studio for ESB
Talend Real-Time Big Data Platform
Module
Talend Studio
Content
Data Governance > Third-party systems > Technical components
Data Quality and Preparation > Third-party systems > Technical components
Design and Development > Third-party systems > Technical components

Creating a subJob with a multiple path structure from a single source to a single target, as shown in the capture below, is not allowed in the Talend Studio. In this document, you will find two workaround examples to solve this problem that provide the same result.